External planning ranges for replacement
Planning ranges based on external benchmarks published October 2026 (sources linked beside each figure), not Loudoun Decks prices or quotes. Ranges assume the area, whether the structure is new or existing, the material tier, railing, stairs, demolition, and whether permits are included or excluded, as noted in each row. Elevated, multi-level, custom railing or lighting, site access, permit and HOA conditions, and structural repairs can move a project above these ranges. Your written estimate โ after a site visit and measurements โ is the only project price.
External 2026 planning benchmarks, not Loudoun Decks prices: resurfacing composite decking on a structure that has been confirmed sound is about $15โ$45 per square foot (LatestCost, September 25, 2026), or about $4,800โ$14,400 for 320 square feet and $6,000โ$18,000 for 400 square feet. Demolition of an old deck, when it applies, is a separate about $5โ$15 per square foot (Angi, updated September 29, 2026), or about $1,600โ$4,800 for 320 square feet and $2,000โ$6,000 for 400 square feet. Angi also publishes one 360-square-foot replacement example of $7,200โ$16,900, combining demolition, materials, and labor. A written estimate after a site visit and measurements is the only project price.
A new composite deck, as distinct from resurfacing, is planned on composite deck cost in Northern Virginia. Wood-to-composite conversion details are on replace a wood deck with composite. This page is the deck replacement page.
Inspect these parts before choosing resurfacing| Part | What to look at | Published guidance |
|---|
| Ledger | Flashing, the connection to the house, and rot at that joint. | Trex resurfacing guidance says to check ledger attachment, flashing, joists, and hardware before new boards go on. A failed ledger is a replacement issue. |
|---|
| Joists | Soft spots, span, and spacing for the board you want. | New boards do not correct deteriorated joists. Confirm spacing in the selected product guide. TimberTech publishes joist-spacing instructions. |
|---|
| Footings | Movement, post bases, and whether the footings will change. | Loudoun County (accessed October 18, 2026) requires a building permit and a zoning permit for every deck, with footing, framing, and final inspections. |
|---|
| Stairs and guards | Stringers, connections, and any change to stair or guard layout. | Work that changes stairs or guards is structural. Fairfax County requires a permit for decks, including alterations. |
|---|