What We Build
Grill Islands
a written estimate
Built-in gas grills with stone or stucco surround, granite countertops, storage drawers
Kitchen + Bar
a written estimate
L-shaped or U-shaped island with grill, sink, refrigerator, and bar-height seating
Full Outdoor Kitchen
a written estimate
Complete kitchen: grill, side burner, pizza oven, sink, fridge, ice maker, trash pull-out, lighting
Pizza Ovens
a written estimate
Wood-fired or gas pizza ovens standalone or integrated into island
Outdoor Kitchen Cost in Northern Virginia
| Configuration | What's Included | Price Range |
|---|---|---|
| Basic Grill Island | Built-in grill, stone surround, granite top, storage | a written estimate |
| Kitchen + Bar | Grill, sink, fridge, bar seating, lighting, gas line | a written estimate |
| Full Kitchen | Grill, burner, pizza oven, sink, fridge, ice maker, lighting, electrical | a written estimate |
| Add to Existing Deck | Grill island on reinforced deck section, fire-rated materials | a written estimate |
| Combo: Deck + Kitchen | New deck with integrated outdoor kitchen designed as one | a written estimate |
Materials That Survive Virginia Weather
Countertops: Granite and porcelain tile handle freeze-thaw without cracking. We avoid marble (stains) and concrete (cracks in cold) outdoors.
Island structure: CMU (concrete block) or galvanized steel frame not wood framing, which rots near water and heat sources.
Appliances: 304-grade stainless steel rated for outdoor use. We work with Blaze, Bull, Lynx, and DCS brands. Avoid indoor appliances outdoors they'll rust within one Virginia winter.
Finishes: Natural stone veneer, stucco, or porcelain tile. All rated for exterior use and freeze-thaw rated for Virginia's climate.
Permits and Utilities
Gas line: Any new gas line requires a plumbing permit and inspection. We coordinate with licensed plumbers.
Electrical: Outlets, lighting, and appliance circuits require electrical permits. GFCI protection required for all outdoor outlets.
Water/drain: Outdoor sinks require water supply and drain connections plumbing permit required.
Structure: Covered outdoor kitchens (with roof/pergola) require building permits. Freestanding islands on existing patios may not. We determine what's needed and handle all submissions.
Combine with a Deck Package Pricing
Building your outdoor kitchen as part of a new deck project is 15โ25% cheaper than adding one later. We design the deck framing to support the kitchen weight from the start, run utilities during construction (before decking goes on), and eliminate the cost of a second mobilization.
Popular combo: 400 sqft Trex Transcend deck + built-in grill island with granite counter, sink, and bar seating = a written estimate (vs a written estimate if built separately).
Real Projects
a written estimate Grill Island, Ashburn
L-shaped stone island with Bull 30" grill, granite counter, double storage doors, and LED under-counter lighting on existing paver patio.
a written estimate Kitchen + Bar, Leesburg
U-shaped island: Blaze 32" grill, side burner, outdoor-rated fridge, farm sink, bar with 4 stools. Natural stone veneer, bluestone counter. New gas and water lines.
a written estimate Full Kitchen + Deck, Centreville
Built as part of a 450 sqft Trex Transcend deck project. DCS grill, pizza oven, sink, fridge, ice maker, trash pull-out, can lighting under pergola cover. Total deck + kitchen project.
Frequently Asked Questions
How much does an outdoor kitchen cost in Northern Virginia?
a written estimate. Basic grill island: a written estimate. Full kitchen: a written estimate. Most projects: a written estimate.
Do I need a permit?
Gas, electrical, or plumbing work requires permits. Freestanding grill islands on existing patios may not. We determine and handle everything.
Can you build on an existing deck?
Yes if the framing supports the weight. Fire-rated materials required around grills. We inspect first.
What materials survive Virginia winters?
304 stainless steel appliances, granite/porcelain counters, CMU or steel frame. No wood framing near heat/water.
How long does it take?
2-3 weeks for a grill island, 4-6 weeks for a full kitchen after permits.



